- Collection2018/6 - Photographs of E.Z. Co. Zinc Works at Risdon
- 31 more...
- Item32 - Horse and cart used in excavation of Derwent Prime furnace site at E.Z. Co. Zinc Works
- Item33 - Building foundations for Derwent Prime furnace at E.Z. Co. Zinc Works
- Item34 - Boxing for foundations of Derwent Prime furnace at E.Z. Co. Zinc Works
- Item35 - Framework for pouring concrete in the power station building at E.Z. Co. Zinc Works
- Item36 - Framework of roasting division building at E.Z. Co. Zinc Works at Risdon
- Item37 - Bricks stacked inside corrugated iron shed at E.Z. Co. Zinc Works at Risdon
- Item38 - Structure of power house takes shape at E.Z. Co. Zinc Works at Risdon 1921
- Item39 - Bricks and timber stacked near corrugated iron building at E.Z. Co. Zinc Works at Risdon
- Item40 - Construction of roasting and leaching division for the 100-Ton Plant at E.Z. Co. Zinc Works at Risdon
- 14 more...